
Cement Kiln Line, 3000 t/d
Design and construction supervision of a 3000 t/d clinker kiln line from raw material storage and handling, raw grinding, pyroprocessing and clinker storage.

Waste Fuels
Waste fuels such as agricultural waste and tire chips are an excellent and economic source of replacement fuel to coal.
Mine Paste Fill
An open pit expansion to two underground mines, required a new paste backfill system to produce a cemented backfill used to fill underground stopes.
Flotation Plant – Gold
Detail Engineering and Procurement services for a new Carbon Preflotation Plant and Tie-Ins.
Slag Grinding Mill
A vertical mill for Slag grinding.
Gold Mine – Brownfield EP
A Brownfield project to recommission a 2500 t/d gold concentrator in a remote location in Northern Canada.
Cogeneration Plant – Biomass
A 25 MW cogeneration power plant, fired by waste wood.
Rail Terminal – Coal
2 x 30,000T capacity coal silos for rail loading.

