Challenge
An exceptionally large, 70,000 t capacity clinker storage was required for this cement producer in a remote, high seismic part of Ecuador. The silo was located in close quarters to the existing plant structures and had to be built in a timely manner.

Process
Extra large capacity storage silos run the risk of encountering eccentric flow on withdrawal. Advanced methods of calculating the impact of eccentric flow on material pressure was employed. Also, in order to speed up construction, the large roof and penthouse was designed such that it was integrated into the slipform deck.
Delivery
Consultec was responsible for mechanical and civil/structural design.
| photo |
Explore the Project Gallery